Wednesday, January 26, 2011

Kentucky is buried under coal ash-Our concerns

Our Concerns

Our concerns:

·       The Division of Waste Management should not grant the permit until after EPA finalizes the new coal ash rules; and the permit should incorporate provisions of the new regulations.
·       LG&E needs to phase out burning coal as soon as possible, and to start transitioning to solar and hydropower soon.
·       LG&E should move the location of the ash dump site out of the flood plain,
·       LG&E must use state of the art liners wherever they dump coal combustion waste to avoid groundwater contamination
·       This landfill should not be permitted until LG&E has stopped all leakage from the existing landfill and remediated the contamination there.
·       Good monitoring wells must be required with enforceable monitoring and reporting requirements so we have scientific groundwater monitoring that is enforceable around the coal ash dump.
·       LG&E must redesign the landfill to minimize the destruction of streams and wetlands.

No comments:

Post a Comment